Method and accountability
Principle
Numbers come from deterministic calculation modules with documented rules. AI orchestrates and writes the explanation, but does not calculate and does not add numbers. This page shows which standards we use, what has been verified per module and what has not.
Standards and sources
Reference values only; we do not copy the text of the standards. Consult the full text via nen.nl / NEN Connect, and for BAL and Wkb the live source (iplo.nl).
Three independent calculation modules
Deterministic according to the standards, not a black box. AI orchestrates; the numbers come from the cores.
Electrical
- Load balance, simultaneity factor & required kVA
- Cable calculation, selectivity & earth-leakage protection (30 mA)
- Power quality, PV/CHP/storage & feed-in to the grid
- Grid congestion + connection strategy (capacity map)
NEN 1010:2020+C1 · NEN 1010-8:2026 · ACM-kader
Water
- Irrigation water balance, source/RO & basin volume
- Drip irrigation, fertigation (EC/pH) & recirculation
- Purification efficiency ≥ 95 % — 4 compliance options
- Schematic drawing of the water system (P&ID)
BAL 2026 · IPLO · BZG-lijst
Structure
- Parametric frame: Venlo · wide-span · tunnel
- Loads G/S/W/C/service per EN 1990/1991
- Rough section estimate + UC indication
- Bill of materials + handover package for the structural engineer
NEN-EN 13031-1 · Eurocode (EN 1990/1991/1993) + NL NB
Status per calculation module
Electrical (NEN 1010) Tested, not signed
Deterministic rules with reference values; every run checks NEN 1010 points (circuits, cables, short circuit, selectivity) and shows pass/warn/fail for each. Automated tests cover the calculation logic. There is no signature from an authorized NEN 1010 installer: that remains required for execution.
Water (BAL) Preparation, not a submission
Water balance and BAL assessment (purification efficiency, measurement frequencies, preparation of the milieujaarrapportage). It is a tool: the grower does the submitting. Frequencies and percentages must come from the live BAL/IPLO text and be verified at the source.
Structure (Eurocode, NEN-EN 13031-1) unvalidated
Own 2D frame calculation (one representative portal frame). Level 1 (analytical checks) is done; level 2 (reference case with a structural engineer) is NOT completed. That is why every structural document is marked ‘unvalidated’ and ‘pre-feasibility — niet geschikt voor uitvoering of vergunning’. Only a human changes this status.
Cost estimate Indicative, labelled per line item
Every line item carries a price class: A online source, B quote/price from the owner, C industry benchmark, H hypothesis. Class A requires stored evidence; without evidence a price is downgraded. The cost estimate is not a quote.
Drawings and 3D Indicative
SVG/DXF/PDF and the 3D model are built from the same engine results. They are preliminary-design drawings, not working drawings; every document carries the AI-concept watermark.
What we do not do
- No construction design and no permit application; the result is a preliminary design and an AI draft.
- No replacement of a structural engineer's calculation and no independent kwaliteitsborger (Wkb).
- Nothing becomes legally valid without a real signature of an authorized signatory.
- No price guarantee: the cost estimate is indicative and not a quote.
- No invented references, client logos or counters: we only show them once they are real.
Versions and journal
- 2026-11-24 — Isometric systems diagram, six renders and blocks in the 3D model of the example.
- 2026-11-24 — Daily backup with restore check and monitoring.
- 2026-11-18 — Order conveyor with states, revisions and operator queue; country packages without their own numbers.
- 2026-11-18 — Narrative agent with numeric guard: AI may not add or change numbers.
- 2026-05-31 — Standards register (reference-only) with a check date per standard.